Project Lichtwiesenbahn - cable laying works

2020/09/21

Project Lichtwiesenbahn – cable laying works

Impairment of building operation in the L1|01 MB Institute building on 21 and 22 September 2020

Within the scope of clearing the route for the Lichtwiesenbahn, further reallocation of supply cables will take place during the period mentioned above.

This will lead to the following impairments of the building operation in the object L1|01 Mechanical Engineering Institute building:

  • Interference with telephone connections
  • Failure of the elevator emergency calls: For safety reasons, the elevators must therefore be taken out of service on September 21, 2020, 11:00 a.m., for the duration of the work.
  • Failure of the connections to the main fire alarm system: At the building's fire alarm control panel, a fire watch will automatically report to the fire department in the event of a fire alarm.
  • Failure of the intrusion alarm control panel of the DiK.