Lichtwiesenbahn project – cable laying works

Impairment of building operation on 13.10.2020 between 8.00 a.m.and 15.30 p.m.

2020/10/02

As part of the clearing of the route for the Lichtwiesenbahn, there will be disruptions to building operations on this day.

The following impairments occur:

  • Failure of the lift emergency calls: The lifts must therefore be taken out of service for safety reasons for the duration of the work.
  • Failure of the connection to the fire brigade main detector: At the building's fire alarm control centre, a fire watch takes over the automatic reporting to the fire brigade in case of a fire alarm.

For questions please contact .