Maintenance work: Maintenance of the main power switches in L5|08

On 09.05.2023 from 7.00 a.m. to 5.00 p.m.

2023/05/05

+++ Update from 10/05/2023: Maintenance successfully completed. +++ During this period, the power in building L5|08 (Housing and Lichtenberg High Performance Computer) will be switched off for the entire day to allow for the replacement of two main power switches in the medium voltage sub-distribution. This maintenance is required by law every 10 years and requires the power to be switched off in the entire L5|08 building.